Two families. Tight boundaries.

Advisory Services diagnose and recommend. Execution Services run it for you. Fees on Advisory are ranges because scope varies by site count, meal volume, and complexity. Fees on Execution are sized per engagement against the value we unlock for you.

Family One

Advisory Services: diagnose and recommend.

T1 through T4 plus three fixed-scope packages. Ranges shown; exact fee set per proposal after scope is agreed.

T1 · Rapid Intelligence AED 5K to 15K

A three to five-day deep-read on a specific decision: a location, a menu, a cost line, a supplier. Short report, conclusion-first, for buyers testing us before a larger engagement.

3 to 5 days · all tiers
T2 · Strategic Advisory AED 15K to 50K

Two to four weeks on one complete question: pre-lease feasibility, operational due diligence, unit-economic review, delivery-platform economics, kitchen or production engineering. Lead offer for developers and investors.

2 to 4 weeks · lead offer for Tier B
T3 · Transformation AED 50K to 150K

One to three months on a portfolio-scale question: outlet triage, operational reset, multi-site turnaround, a second-brand readiness programme. Lead offer for multi-outlet operators.

1 to 3 months · lead offer for Tier A
T4 · Retained Advisory AED 8K to 20K / month

Steady counsel on the questions that arise between T3 engagements: supplier shifts, a second-brand decision, a compliance pathway. Minimum three months, most renew.

Ongoing, minimum 3 months · Tier A upsell
Packages

Four fixed-scope packages.

Scope is fixed because the question is fixed. Price is fixed for the same reason.

Short pre-lease review before a restaurant site is signed. Rough kW load, likely extract CFM range, exhaust, grease, drainage, landlord questions, and a sign, renegotiate, add conditions, or walk-away recommendation. Expanded T1 scope applies when site visits or formal review are needed.

3 working days · pre-signature property risk
Pre-Opening Kitchen Package AED 12K to 25K

New-outlet readiness check in the four weeks before first service. Kitchen commissioning, staff flow, menu-to-line alignment, day-one failure modes.

2 to 3 weeks · Tier B upsell
Kitchen Performance Review AED 5K to 8K

One-week audit of an operating kitchen. Throughput, staffing shape, equipment utilisation, cost leakage. Often the entry into a T3 Transformation.

1 week · Tier A trial
Kitchen Downsizing Package AED 10K to 15K

Rent-pressure reset: same menu and output, less floor area. Spec rework, equipment substitution, process re-routing, staffing impact.

2 weeks · operating clients under rent pressure
Family Two

Execution Services: run it for you.

Procurement and project management. Fees sized per engagement against the value we unlock, typically ten to twenty per cent of the saving or value released. No published fee ranges.

Procurement Management · category Fee per engagement

Cold-room only, combi-oven fleet, warewash, or any single-category sourcing. Specifications through delivery QC and defects-liability close-out.

3 to 6 weeks
Procurement Management · single-site Fee per engagement

Full single-site equipment procurement, typical AED 500K to 1M equipment scope. Spec, RFP, evaluation, contract, delivery.

2 to 4 months
Procurement Management · portfolio Fee per engagement

Multi-site or rollout procurement, typical AED 2M+ equipment scope. Designed for consolidation and standardisation alongside the work.

4 to 9 months
Conflict note · procurement

Procurement Management is governed by the Transparency Policy. You control the tender. If Cleresdyne is invited to bid, it is your decision, in writing.

Project Management · renovation Fee per engagement

Renovation or refit end to end. Often follows a Kitchen Performance Review that identifies a kitchen rework is the cheaper answer.

2 to 5 months
Project Management · single-site fit-out Fee per engagement

New single-site build, typical AED 1 to 3M project scope. Pre-construction planning through handover.

3 to 6 months
Project Management · multi-site rollout Fee per engagement

Multi-site rollout, five or more sites. Designed for schedule compression and standardisation across units.

6 to 18 months
Project Management · CPK build Fee per engagement

Central production kitchen programme. Site, process, equipment, commissioning, with production volumes and multi-outlet supply in view.

6 to 12 months
Hard rule · project management

We do not act as Project Manager on any project where Cleresdyne Group is the contractor. If you want both, we decline one role. This cannot be overridden by consent. See Principle 8 of the Transparency Policy.